Loop velocity review: 2026-09-03

What slowed the agent loops on 2026-09-03 (10:25 to 21:30 Pacific, three loops running: booking v1.5, embedded billing, providers L), and the plan to fix each cause. Numbers come from the 1,000 workflow runs GitHub recorded in that window and the failed-job logs behind them.

Where the time went

A booking WP cycle is: agent implements (4 to 16 min) → PR open → CI + merge (7 to 55 min) → release + deploy + smoke (4.6 min) → next launch. The floor for "PR open to merged" was 7 min, which is one e2e run. Everything above the floor was one of the causes below.

WorkflowRunsFailedCancelledNotes
Unit (test-unit.yml)22482277 of the 140 successful runs were the push duplicate
E2E (test-e2e.yml)137831p50 6.6 min, six runs over 7.8 min against an 8 min step cap
Booking loop19405667 more were skipped no-op runs
Performance budget96295every sampled failure is the same infra flake
Release on main32204.6 min each, serial after every merge

Causes, ranked by lost time

1. unit (web) died for three hours after #3280 merged

From 00:55 to 03:50 UTC, 82 unit runs failed on every branch and main was red for 7 of 9 merges. Every log ends the same way: TimePicker.test.tsx passes, then 20 to 80 s of silence, then "The runner has received a shutdown signal" (SIGTERM, exit 143). That message is the hosted runner VM dying, which is what a memory or CPU blow-up looks like, not a hung assertion (bun's per-test timeout would have fired on a hang). The next file in shard 2 is TimePickers.test.tsx, and the first red main run is the merge commit of #3280 (copy icons: CopyButton gained onMouseDown/onKeyDown stopPropagation and EventForm lost several elements). The run before it was green.

The loop made it worse. The agent on #3285 spent 2.5 h and 18 commits rewriting the TimePicker tests around the symptom (drop user.tab, a three-option list, click-before-tab), merged main into its branch eight times because every merge conflicted, and closed/reopened the PR to re-fire CI. That one branch produced 30 unit runs, 12 e2e runs and 8 Lighthouse runs. The other loops kept self-merging onto red main.

Plan:

  • Reproduce at 5798d7c with bun test TimePickers.test.tsx under a memory cap and fix the component or harness, then restore the assertions #3285 weakened. Owner: one human-reviewed PR, not a loop WP.
  • Default WEB_TEST_SHARDS to 4 in test-parallel.ts. Shard 2 is 191 files in one jsdom process; halving it keeps peak RSS clear of the 7 GB runner.
  • Add one rule to .github/prompts/booking-loop.md: "runner has received a shutdown signal" during a test step is memory, not a hang. Do not rewrite tests to route around it; bisect the merge that introduced it or stop with booking-loop-needs-human.
  • Merge-guard refuses to merge onto a red main: before gh pr merge, check the latest Test run on main; if it failed, label booking-loop-needs-human and stop. One deterministic check in booking-loop-merge-guard.sh.

2. The booking loop cancels its own runs

56 Booking loop runs were cancelled: 41 merge-guards, 13 post-deploy (smoke + launch next), 2 hourly kicks. Cause: booking-loop.yml puts all three jobs under one concurrency.group: booking-loop with cancel-in-progress: false. GitHub keeps one pending run per group and cancels the older pending run when a newer one arrives. Merge-guard holds the group for up to 20 min inside gh pr checks --watch, and every PR push in the repo (67 skipped no-op runs) enters the same group. A cancelled post-deploy means the next WP waits for the hourly cron. A cancelled merge-guard means the PR waits for the next label or push event.

Plan:

  • Remove the workflow-level group. Give merge-guard its own concurrency: booking-merge-${{ github.event.pull_request.number }} and keep post-deploy and kick on booking-loop.
  • Stop holding a runner while CI runs: after the path and size checks, gh pr merge --auto --squash --delete-branch. GitHub merges when the required checks pass, still with the PAT so release fires. The --watch loop and the 20 min timeout go away.

3. Unit runs twice per PR push

test-unit.yml triggers on pull_request and on push with no branch filter, so every agent push runs lint, knip, type-check and the five-leg matrix twice. 77 of the successful unit runs were the push duplicate, and the two results confused the agent on #3285 ("push unit (web) passed, PR run failed").

Plan: PR #3284 (providers L WP-03) already limits push to main, matching test-e2e.yml. It is blocked only because it touches .github/. Review and merge it.

4. Performance budget is red 30% of the time for an infra reason

29 of 96 Lighthouse runs failed. Every failure sampled is "Static server never came up": npx --yes serve@14 did not start within 30 s. The check is not required, but it paints PR check lists red, and agents watching gh pr checks treat it as a stall (PR #3292's own summary). It also runs on every PR touching packages/web, which is most of them: 220 runner minutes in the window.

Plan:

  • Merge PR #3292 (providers L WP-07): run on main and nightly, not per PR.
  • Fix the flake anyway: add serve to devDependencies so it comes from the bun cache instead of an npx download, and start it with bunx serve.

5. e2e is the critical path with no headroom

The e2e job is one Playwright worker running 107 tests serially with two retries: p50 6.6 min, six runs over 7.8 min, and main's 23:35 run was killed by the 8 min step cap mid-axe-scan. The fastest PR-to-merge time all day was 7 min, all of it e2e.

Plan: shard e2e with Playwright --shard in a two- or four-leg matrix (providers L WP-04, #3215, is this). Keep one worker per leg. Container init plus install is 50 s per leg, so a four-way shard lands around 2.5 min. Keep the 8 min step cap; it was right.

6. unit (scripts) open-handle hang

Twice in the window (main at 23:35, PR #3204 at 23:40) the scripts suite passed every test, then sat for four minutes until test-mongo-env.ts killed it, failing the run. That turned main red and stretched #3204 to 55 min. The leak is documented in test-mongo-env.ts and not fixed.

Plan: in test-mongo-env.ts, pipe stdout, treat bun's Ran N tests across M files summary as the result, and kill the child once it appears. Exit with bun's pass/fail, not with the leak.

7. Every PR conflicts with every other PR

Each WP appends one row to .agents/ledger.md, so every squash merge on main conflicts with every open PR. That is why #3285 carried eight merge(main) commits, each of which cost a full CI round. Handoff files under .agents/handoffs/<issue>.md already hold the same information.

Plan: stop writing per-WP rows to .agents/ledger.md from the loop. Keep the handoff file as the record; regenerate the ledger from handoffs if a table is still wanted. Add to the loop prompt: never close/reopen a PR or push merge-from-main commits to re-run CI.

8. Release runs serially after every merge and gates the next launch

32 releases at 4.6 min each (tag, four Docker builds with no layer cache, two deploys, health checks), then smoke, then the next WP is launched. Two releases failed on a Docker Hub pull flake (mongo:8 "No such image") during the health check. With 13 booking WPs, that is over an hour of the loop waiting on deploys it does not need.

Plan:

  • Merge PR #3293 (providers L WP-08): Docker layer cache and one Bun pin.
  • Launch the next WP from merge-guard right after the merge instead of from post-deploy. Keep post-deploy smoke; on failure it labels the merged issue booking-loop-needs-human and stops further launches. The next agent's work never depended on staging.

What landed on 2026-09-04

CauseChangePR
1Four web shards with a 5 GB RSS guard that names the shard; the weakened TimePicker assertions restored and green under that layout#3300, #3301
1, 2, 8Merge guard enables GitHub auto-merge after the size, path and red-main checks; per-PR guard concurrency; next WP launches on merge; the agent labels and stops instead of self-merging#3299
3Unit runs once per PR push#3284
4Lighthouse on main and nightly only; serve from the bun install; script budget recalibrated to 1,000 KB#3292, #3300
5e2e in four shards behind one required e2e gate: 6.5 min to about 3.5 min wall#3300
6Scripts runner exits on Bun's summary instead of a four-minute hang#3300
7.agents/ledger.md deleted; status is the issue's labels, PR and closed state#3299
8Docker layer cache, one Bun pin#3293

Open loop PRs that still add a ledger row (#3283, #3294) will conflict on the deleted file; drop the row when rebasing them.

Order of work

  1. Merge the three blocked providers L PRs today: #3284 (unit once), #3292 (perf budget off PRs), #3293 (Docker cache). They are done and reviewed.
  2. Fix the TimePickers memory blow-up and restore the weakened tests (cause 1).
  3. Booking loop workflow: per-PR merge concurrency, --auto merge, red-main guard, launch-after-merge (causes 2, 1, 8). One PR to .github/.
  4. Loop prompt: shutdown-signal rule, no retrigger tricks, no ledger row (causes 1, 7).
  5. WEB_TEST_SHARDS=4, scripts-runner summary exit, serve from the bun cache (causes 1, 6, 4).
  6. Shard e2e (cause 5, #3215).

Items 3 to 6 each touch .github/ or the test runners, so they need a human merge. None of them adds a new job, service, or config knob.